top of page

Town of Wakefield

Wakefield Memorial High School

CM

BOND Building Construction

Architect

SMMA

Cost

$220,500,000

Size

260,027 SF

Project Description

LeftField was hired by the Town of Wakefield for the new Wakefield Memorial High School Feasibility Study along with SMMA, the selected Designer.  At the beginning of Schematic Design, BOND Building was procured as the Construction Manager for the project and brought on early to assist with developing the Project Budget, Schedule and Construction Logistics.  After the project was voted to move forward in early 2023, the Project Team began work on the design and construction of a new high school on the existing football field and track which will allow school operations to be maintained throughout construction.  After the completion of the new school, the existing school will be demolished and the football field and track with be replaced.