top of page

Town of Wakefield
Wakefield Memorial High School
CM
BOND
Architect
SMMA
Cost
$200,000,000
Size
260,027 SF
Project Description
LeftField was hired to manage the Feasibility Study process for the Wakefield Memorial High School.
This school is currently in the Schematic Design stage with local approval vote anticipated in 2023.
KEEP BROWSING OUR PORTFOLIO
bottom of page