William H. Galvin Middle School

CM

Consigli

Architect

Ai3 Architects

Cost

$242,000,000

Size

218,350 SF

Project Description

LeftField was hired to manage the Feasibility Study and Schematic Design process for the William H. Galvin Middle School in Canton, MA in 2023. The project was approved by the Town in December 2024 and is currently in the Construction Documents phase.

 

The new 218,350 SF building will serve 1020 students in grades 5 through 8 on the same site as the existing Galvin Middle School. The existing school will remain in operation during construction and will be demolished once the new building is occupied. The new school will help alleviate overcrowding at the Town’s three elementary schools and expand programming offered to more Canton students by bringing the 5th grade up to the middle school level. To support Canton’s strong commitment to the performing arts and athletics, the Town has decided to include an 800-seat auditorium and larger gymnasium in the project.

 

The new school is expected to open in Fall 2028 with site and field construction to be completed by the start of the following school year.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2025 Leftfield Project Management.

Site by Pretty Good Design Co.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page