Town of Wakefield

Wakefield Public Safety

CM

BOND Building Construction

Architect

HKT Architects

Cost

$12,100,000

Size

49,300 SF

Project Description

LeftField was selected as the Owner's Project Manager for Wakefield’s Public Safety Building project. The approved program for the Wakefield Public Safety Building proposed the reconfiguration and renovation to the main entry lobby and other selected spaces of the 3 floors within the Police Administration Building. A new three-story addition was constructed in front of the Police Administration Building and the existing Sallyport was extended at the rear of the building.


Construction took place while the existing Wakefield Public Safety Building remained fully occupied and fully operational. The project was completed in 3 phases, with final completion by the first quarter of 2023.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2025 Leftfield Project Management.

Site by Pretty Good Design Co.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page